banner
blank
  Home    News    Product Info    Projects    Movies    Contact      
blankblank
blank

 Welcome 
blank
blankblankblankblank
blankblank
blank

 Services 
blank
blankblankblankblank
blankblank
blank

 Cost 
blank
blankblankblankblank
blankblank
blank

 Key Personnel 
blank
blankblankblankblank
blankblank
blank

 Mission Statement 
blank
blankblankblankblank
blankblank
blank

 FAQ 
blank
blankblankblankblank
blankblank
blank

 Links 
blankblank
blankblankblankblankblank
blank
SBS Panel Square Foot Costs

Scenario #1

Costs for a 16' wide by 24' tall panel (384 square feet) load bearing wall using 6" studs on 16" centers

MATERIALS
ITEM DESCRIPTION UNIT AMT COST TOTAL SF COST
Studs & Track 15/8" x 6" x 16ga on 16" OC 13 @ 24' LF LF 344 $1.80 $619.20 $1.61
Mesh 384 sf + 24 sf for laps SF 408 $0.13 $53.04 $0.14
Cable For lift points 4 ea LF 24 $0.50 $12.00 $0.03
Screws For framing the panel SF 384 $0.04 $15.36 $0.04
Anchors Threadall and epoxy 9 ea EA 9 $3.00 $27.00 $0.07
Bolts Panel bolts & Washers EA 15 $1.00 $15.00 $0.04
Forms Forming Lumber LF 80 $1.25 $100.00 $0.26
Bond Breaker Bond breaker & Cure SF 384 $0.08 $30.72 $0.08
Concrete 3500# 3/8 @ 2" + 5 yd for picks CY 2.87 $65.00 $186.55 $0.49
Patch Sack and Patch Material SF 384 $0.03 $11.52 $0.03
        Total $1,070.39 $2.79

LABOR
ITEM DESCRIPTION UNIT AMT COST TOTAL SF COST
Frame Fabricate 15 pcs - 2 men 3 hour ea HRS 6.6 $30.00 $198.00 $0.52
Form Form 80' LF 2 men 1.5 hour ea HRS 3 $30.00 $90.00 $0.23
Mesh Cut & Tie 384 sf 2 men .75 hour ea HRS 1.5 $30.00 $45.00 $0.12
Picks Install 4 pcs cable 1 man hour HRS 1 $30.00 $30.00 $0.08
Place concrete Pour & float 2.87 cy 4 men 1 hour ea HRS 4 $30.00 $120.00 $0.31
Patch 1 man 2 hour HRS 2 $30.00 $60.00 $0.16
Erect 4 men .5 hour ea HRS 2 $30.00 $60.00 $0.16
Anchors 9 bolts 10 min ea 1.5 hour HRS 1.5 $30.00 $45.00 $0.12
  Total Labor HRS 21.6 TOTALS $648.00 $1.69

EQUIPMENT & SUBS
ITEM DESCRIPTION UNIT AMT COST TOTAL SF COST
Pump Concrete Pump YDS 2.87 $13.00 $37.31 $0.10
Crane $200 Per Hour HRS 0.6 $200.00 $120.00 $0.31
Braces Brace Rent for 24' H $24/Month Each EA 2 $24.00 $48.00 $0.13
Vert Joints Backer Rod and Caulk LF 24 $3.00 $72.00 $0.19
  Total Equipment       $277.31 $0.72

RECAP SF COSTS FOR 16L X 24H PANEL
ITEM DESCRIPTION UNIT AMT COST TOTAL SF COST
Materials         $1,070.39 $2.79
Labor         $648.00 $1.69
Equipment         $277.31 $0.72
Use Fees SBS Royalties       $384.00 $1.00
  Total Panel Cost       $2,379.70 $6.20




Scenario #2

Costs for a 16' wide by 24' tall panel (384 square feet) load bearing wall using 8" studs on 24" centers

MATERIALS
ITEM DESCRIPTION UNIT AMT COST TOTAL SF COST
Studs & Track 15/8" x 8" x 16ga on 24" OC 9 @ 24' LF LF 248 $1.95 $483.60 $1.26
Mesh 384 sf + 24 sf for laps SF 408 $0.13 $53.04 $0.14
Cable For lift points 4 ea LF 24 $0.50 $12.00 $0.03
Screws For framing the panel SF 384 $0.04 $15.36 $0.04
Anchors Threadall and epoxy 9 ea EA 9 $3.00 $27.00 $0.07
Bolts Panel bolts & Washers EA 15 $1.00 $15.00 $0.04
Forms Forming Lumber LF 80 $1.25 $100.00 $0.26
Bond Breaker Bond breaker & Cure SF 384 $0.08 $30.72 $0.08
Concrete 3500# 3/8 @ 2" + 5 yd for picks CY 2.87 $65.00 $186.55 $0.49
Patch Sack and Patch Material SF 384 $0.03 $11.52 $0.03
        Total $934.79 $2.43

LABOR
ITEM DESCRIPTION UNIT AMT COST TOTAL SF COST
Frame Fabricate 11 pcs - 2 men 3 hour ea HRS 6 $30.00 $180.00 $0.47
Form Form 80' LF 2 men 1.5 hour ea HRS 3 $30.00 $90.00 $0.23
Mesh Cut & Tie 384 sf 2 men .75 hour ea HRS 1.5 $30.00 $45.00 $0.12
Picks Install 4 pcs cable 1 man hour HRS 1 $30.00 $30.00 $0.08
Place concrete Pour & float 2.87 cy 4 men 1 hour ea HRS 4 $30.00 $120.00 $0.31
Patch 1 man 2 hour HRS 2 $30.00 $60.00 $0.16
Erect 4 men .5 hour ea HRS 2 $30.00 $60.00 $0.16
Anchors 9 bolts 10 min ea 1.5 hour HRS 1.5 $30.00 $45.00 $0.12
  Total Labor HRS 21 TOTALS $630.00 $1.64

EQUIPMENT & SUBS
ITEM DESCRIPTION UNIT AMT COST TOTAL SF COST
Pump Concrete Pump YDS 2.87 $13.00 $37.31 $0.10
Crane $200 Per Hour HRS 0.6 $200.00 $120.00 $0.31
Braces Brace Rent for 24' H $24/Month Each EA 2 $24.00 $48.00 $0.13
Vert Joints Backer Rod and Caulk LF 24 $3.00 $72.00 $0.19
  Total Equipment       $277.31 $0.72

RECAP SF COSTS FOR 16L X 24H PANEL
ITEM DESCRIPTION UNIT AMT COST TOTAL SF COST
Materials         $934.79 $2.43
Labor         $630.00 $1.64
Equipment         $277.31 $0.72
Use Fees SBS Royalties       $384.00 $1.00
  Total Panel Cost       $2,226.10 $5.80